How long does it take to get a new aircraft operational?

A new aircraft would take up to 18 months to get operational. The purchase of a pre-owned aircraft, however, would be much quicker and can be up an running within 1 month.

Back to all FAQs
Previous
Previous

What if there’s an immediate need for travel?